My dream project Schedule

Week 1   Identified the problem (Excessive Emission)
                Collected Data (from testing unit) and Analyzed 

Week 2    Came up with some solutions
                              1.) Use of EEMS
                              2.) Change in Setup of FIP
                              3.) Modified Marking technique in FIP     
                Analyzed the Above solutions using various factors (time, cost, Emission and noise drop levels etc,)

Week 3 Chose to use modified marking technique
                  Worked in Spill Marking unit
                  Calculated accurate Fuel injection pressure
                  Designed Pneumatic Circuit
  
Week 4 Modified Spill Marking Method ( to improve accuracy)
              Designed the new setup
             Estimated the drop in emission level and fuel saved
              Submitted our report to Product development Unit ( for analyzing and approving)